SESTO AMRs deliver wafer and FOUP transfers, engineered for traceability and uptime in ISO-certified fabs.
For mission-critical cleanrooms.
Autonomous material movement for semiconductor facilities.
Designed for FOUP handling, stocker interaction, and coordinated fleet workflows in cleanroom environments.

Automates the transport of materials and components with payloads up to 400 kg, streamlining material flow between production stations.

Built on the MAGNUS AMR platform, PRIME 2 integrates a robotic arm to automate FOUP transfers between process equipment and storage locations.
Coordinate and manage AMR fleets across semiconductor manufacturing environments,
supporting automated FOUP transport, task scheduling, and efficient material movement between process stations.
Manage and monitor multiple AMRs from a single platform, with MES, ERP, and WMS integration to coordinate FOUP and material transfers across semiconductor production areas.
Coordinate AMR movements through shared routes and intersections to minimize congestion and transport delays.
Integrate with manufacturing execution systems (MES) and facility infrastructure to support connected material handling workflows.
Schedule, assign, and prioritize FOUP transport tasks between process tools and storage locations based on production requirements.
Case studies
Transforming industrial landscapes with precision and innovation
Workflow & Integration

Connects effortlessly with tools, stockers and smart racks through SEMI E84/E87 handshakes.

Syncs with fab schedulers and ERP systems for real-time dispatch and traceability.

Fleet intelligence optimizes every path for uptime, safety, and throughput.

From one bay to a full fab, deploy and expand without reprogramming your flow.
Ensures seamless handshakes with fab tools, stockers, and conveyors.
Certified materials and grounding designs prevent electrostatic damage to sensitive carriers.
Meets global electrical and functional safety benchmarks for high-tech manufacturing.
Tranzplus Engineering (S) Pte Ltd
“During COVID-19, manpower constraints impacted our operations. Deploying AMRs helped ease the pressure, improve productivity, and allowed us to take on more orders.”
Tranzplus Engineering (S) Pte Ltd
“During COVID-19, manpower constraints impacted our operations. Deploying AMRs helped ease the pressure, improve productivity, and allowed us to take on more orders.”
Tranzplus Engineering (S) Pte Ltd
“During COVID-19, manpower constraints impacted our operations. Deploying AMRs helped ease the pressure, improve productivity, and allowed us to take on more orders.”
Tranzplus Engineering (S) Pte Ltd
“During COVID-19, manpower constraints impacted our operations. Deploying AMRs helped ease the pressure, improve productivity, and allowed us to take on more orders.”
Discover how SESTO robotics can revolutionize your semiconductor
process.